The installation process of spray exhaust cooling tower needs to pay attention to the following:

1. Site selection and site preparation

The cooling tower should be installed in a place with good ventilation conditions to ensure air circulation and avoid poor ventilation affecting the heat dissipation effect.
The installation site should be kept away from places with dense dust and dirt, acidic gases, and places with a lot of soot and dust to prevent clogging of the film.
The cooling tower should be installed in an open place that will not amplify the noise due to echoes, and ensure that there is a certain distance from the building, 2 meters for single towers and

2.5 meters for combined towers.

The site should be level, barrier-free, and cleared for construction.
Second, the foundation construction

According to the instructions, it is recommended to pre-build the cement foundation, and ensure that the foundation level cannot be tilted, otherwise it will affect the water distribution and motor work.
When installing the support frame, it is necessary to ensure that the support frame is horizontal and stable. For large cooling towers, the treatment of the central foundation cannot be ignored either.

3. Equipment installation

During installation, the sprinkler hose and sprayer need to be installed vertically to ensure uniform water volume and spray, while preventing water leakage in the line.
When installing the sink and the bottom of the basin, it is necessary to ensure that the outer part of the basin is supported on the bottom frame, and the inner circle of the basin is fixed on the flange surface of the tank.
When installing the central pipe, pipe and surrounding support frame, you need to pay attention to their verticality and horizontality.
The installation of the heat sink bracket and heat sink film also needs to ensure that they are horizontal and vertical, and after verifying that each piece is connected, tighten all the screws.
When installing other necessary components such as motors, fans, water pumps, etc., you need to make sure that the electrical connections are correct and working properly.

Fourth, waterway connection

When connecting the water channels in the cooling tower, it is necessary to pay attention to the tightness and watertightness of each connection point to prevent leakage and backflow of water.

5. Safety protection

Set up safety protective railings around the cooling tower to avoid accidental entry and injury of personnel.
Use safety equipment that meets the standards during the installation process, such as seat belts, safety nets, etc., to ensure safety.

liquid jet condensers

6. Inspection and debugging

Once installed, the entire cooling tower system is inspected to ensure that all components are securely installed and that there are no loose components.
Commissioning the system is carried out to ensure that the cooling tower is operating properly and achieving the desired cooling results.

7. Other precautions

During the installation process, the operation is strictly in accordance with the design drawings and operation specifications to prevent errors in the construction process.
Fully consider safety risks, ensure the safe distance of tower assembly and equipment hoisting, set up safety warning signs and take necessary protective measures.
Pay attention to the loss and waste of materials and equipment during the construction process, and optimize cost control and resource utilization efficiency.
After the construction is completed, the trial operation and inspection will be carried out to ensure the normal operation and stability of the equipment and pipelines, and eliminate hidden dangers.
Do a good job in construction records and file management, and provide reference materials for future maintenance and management.